2014.10.12
- - - -
Metro Line 3 has entered the 'start phase'. Line 3 line consists of 25 stations
The line will pass near Dong Tang with a full-length about 36.5 km and pass by Changsha railway station and, on the west side of the river, the university.
Construction and preliminary surveying will begin on 26th December 2014 with the aim of starting trial runs by December 2018.
Make a free website with Yola